An electric installation certificate must be executed every time. This includes diagrams or new surface extensions, and even some orders. What are the benefits of getting an installation certificate? It ensures that the work that has just been carried out is compliant and safe and ensures that its use is safe.
Whether you are a manufacturer or operator, you must guarantee the profitable and safe operation of your electrical installations and power plants. The Electrical Installation Certificate (EIC) and Minor Electrical Works Certificate (MEIWC) provide you, as the person responsible for the safety of the electrical installation, with a declaration that any new installation, alteration or addition is safe for use upon commissioning.
Holding these certificates also forms the basis for any subsequent inspections and tests, helping to save on expensive research work that may be required in the future. Furthermore, if there is an allegation that an injury or fire has occurred due to the electrical installation, the certificate provides useful documentary evidence to show that the installation was installed to sufficient safety standards.
Electrical Installation Certificate will indicate whether the electrical work carried out is:
New – if the entire installation is being installed as new, or if a complete rewiring has been carried out.
Addition – Applies if an existing installation has been modified by the addition of one or more new circuits.
Modification – Applies when one or more existing circuits have been modified or extended (for example, to add a socket) or items such as the consumer unit (fuse box) and switching equipment have been replaced. All new electrical installations must be issued with an Electrical repair services in Dubai. Depending on whether new circuits are being installed, the installation may also need to be modified or supplemented. Where an alteration or addition is carried out but does not include a new circuit, a MEIWC or an EIC may be used.
The Electrical Installation Certificate will need to be issued any time that there is:
When any new single circuit or multiple circuits are being added to any installation that already exists. If there is a change to the distribution board (consumer unit)
If there is a change to the circuit which requires a change to the protective devices.
Following the initial verification, a full inspection and testing procedure must be carried out before the Electrical Installation Certificate can be completed. This is required by law.
Whenever an electrical contractor undertakes a new electrical installation, extension or modification of an existing installation, they must verify and certify that the installation complies with applicable standards. These standards are set by the Electrical Engineering Council of Ireland (ETCI). An approved Electrical Completion Certificate (where applicable) must be submitted to ESB Networks by the Electrical Contractors Regulatory Authority prior to any connection works commencing. Each customer should receive a copy of the Electrical Completion Certificate once the electrical works have been completed. Make sure you save your copy of the certificate.
This requirement ensures your safety. Verify that it complies with applicable regulatory requirements. With self-certification, there is an absolute requirement for comprehensive verification and testing procedures.
This chapter describes the minimum inspection procedures required by Health and Safety Act and BS 7671. The Electrical Installations Regulations require that all installations are inspected and tested during and before installation. The certificate signatory is responsible for all work, whether private or public. The person who signed the Electrical Installation Certificate (EIC) can only be responsible for work for which there is a contractual agreement. Inspection and testing may be carried out by professional operators, installers or design consultants.
Property owners, electrical contractors, and licensed electrical installers can apply for inspection and certification of their electrical work.
Dewa approved contractor provides a certificate after testing for faults such as:
The validity of the distribution and control system. For example, old fuse boxes with wood backs, cast iron switches, or a mix of both should be replaced.
Serviceability of switches, sockets, and light fixtures. Items that may need replacing include old round pin sockets, round switches, fabric covered cables hanging from ceiling sockets to light fixtures, black switches, and baseboard mounted sockets.
The type of electrical wiring system and its condition. For example, a cable covered with black rubber was also deleted in the 1960s.
Make sure there is a fuse box with an appropriate remaining current device (RCD).
Proper identification and advice
All wear, damage, or the degree of other deterioration
Changes in the use of facilities that can lead to dangerous situations
If dangerous or potentially dangerous conditions or potentially dangerous conditions are found, the overall state of electricity installation is declared “dissatisfied.” In other words, to remove the risks and injury devices in the facility, you need to take corrective measures without delay.
The Certificate of Minor Works is designed to be used for additions and installation modifications, which does not apply to the supply of a new diagram. The examples include adding a connector or lighting point to an existing diagram, moving / replacing the lighting switch, etc. This certificate can also be used for the dewa approved contractor replacement of equipment such as accessories or light fittings, but not for the replacement of panels or similar items. However, appropriate checks and tests must always be carried out, regardless of the amount of work carried out. Carelabs Electrical Installation Certificates include the following list of printing rules:
Electrical Installation Certificates are only to be used for the initial certification of new installations, or modifications or additions to existing installations where new circuits are introduced. They cannot be used for periodic inspections where a periodic inspection report is required.
For modifications or additions that do not involve the introduction of new circuits, a certificate for minor electrical works can be used. The original certificate must be issued to the person ordering the work (Regulation 742-01-03). The Contractor must retain a copy.
This certificate is only valid in conjunction with the Inspection Schedule and Test Results Schedule. The signatures attached are those of persons authorized by the firm to perform each of the design, construction, inspection and testing tasks. Signatories authorized to certify more than one category of work must sign in each appropriate location. You need to insert the recommended temporary interval before inserting the first periodic inspection.
The page number of each test result is shown with the total number of relevant sheets. When choosing the scheduled date for the next inspection, consideration should be given to the frequency and quality of maintenance that the installation can reasonably be expected to receive during its intended life, and the period should be agreed between the designer, installer and other interested parties.